slide

Flow has been fronting the transport modelling and economic evaluation to support Waka Kotahi’s SH16 Brigham Creek to Waimauku project.

Flow successfully:

  • Developed a micro-simulation Aimsun traffic model of the SH16 corridor
  • Projected project benefits, capturing emissions, active modes, safety and travel time savings
  • Completed the economic evaluation for the lifespan of the project
  • Assisted Waka Kotahi on transport matters associated with the Notice of Requirement.

Feedback received from the Waka Kotahi project manager “A well written report. Thank you for the effort. Happy with the outcome.”

https://www.nzta.govt.nz/projects/sh16-brigham-creek-and-waimauku/